  • Grafton Way Closure

    Created by John Chamberlain // 0 threads

    From the 24th October for four weeks Grafton Way will be closed between Huntley Street and Tottenham Court Road for drainage works. There is no reasonable alternative to the south until you get to Tavistock Place. Cyclists can use the bus lane in front of UCH if they are careful (note that you will have to make a two-stage right turn at Tottenham Court Road if you want to go up Hampstead Road).

    Please sign in to vote.
  • Roadworks: Royal College Street

    Created by John Chamberlain // 1 thread

    From 20th November until 18th December contractors Sf Stefan will be laying broadband fibre on Royal College Street. This will affect the northbound with-flow cycle lane. As far as possible, a segregated cycle lane will be maintained by closing parking bays and using barriers to make a cycle lane in the main carriageway but there may be a few locations where cyclists temporarily have to use the main carrigeway.

    Please sign in to vote.
  • Roadworks: Calthorpe Street

    Created by John Chamberlain // 1 thread

    From June 1st for several weeks, Calthorpe Street will be one-way westbound for motor traffic to allow replacement of a gas main. We have negotiated with the contractor and Camden to allow contraflow eastbound cycling through the works, but please take care; this may be rescinded if there are any issues. At a later stage, Kings Cross Road will be closed southbound at the junction with Calthorpe Street.

    Please sign in to vote.
  • Roadworks: Guilford Street

    Created by John Chamberlain // 0 threads

    From 18th February to mid June, Guilford Street will be one-way westbound from Grays Inn Road to Grenville Street for the replacement of a 32" gas main. Eastbound traffic will be diverted via Theobalds Road and Roseberry Avenue but cyclists will be better off using Tavistock Place and Ampton Street (CS6). Note that Guilford Street is already permanently one-way westbound west of Grenville Street. At the same time, a raised junction will be installed at Guilford Place.

    Update 22/5/19: Works now extended till end May and new closure due to work on the Great Ormond Street Hospital building. As well as a new gas main, works include electricity and water.

    Update 5/6/19: Works complete as far as Guilford Place but still one-way from there to Grenville Street.

    Please sign in to vote.