Durham bus station redevelopment

Please sign in to vote.

Added by Matthew Phillips

The Durham City Integrated Transport Approach document, part of the proposed new County Durham Plan, states that it is the Council's intention to relocate the bus station in Durham and to remove the A690 roundabout by the railway station, converting it to an ordinary junction with lights.

The document can be viewed at http://durhamccconsult.
limehouse.co.uk/file/2679025 and the relevant sections are 3.49 onwards. The document mentions improving the area for pedestrians but neglects to consider the potential for cycling infrastructure improvements in the area.

The DBUG response to the County Plan (available at http://community.dur.ac.uk/m.e.phillips/cycling/DBUGResponse.pdf ) devotes a section to this matter (see pages 21 to 23).

Opportunities for better cycling infrastructure include:
* restricting vehicle access to North Road and allowing two-way cycling
* linking the station to neighbouring cycle lanes
* better connection to Framwellgate Peth and the north of the city
* remodelling the Milburngate roundabout also
* removing through traffic from the portion of North Road beyond the viaduct

We need to lobby not just for immediate cycling needs to be taken into account in the design for the new road layout, but also for future possibilities by bringing forward design of strategic cycle routes through the city, otherwise we risk losing a very rare opportunity to transform provision at a key city-centre junction.

According to the document, construction will commence in the 2014/15 financial year, with a timescale of 18 months. This means the plans must already be fairly fully developed.

Location

Issues nearby
Back to top