  • Roadworks: Gower Street

    Created by John Chamberlain // 1 thread

    From Monday 25th November to Monday 2nd December Gower Street will be closed from Grafton Way to between Torrington Place and Chenies Street for resurfacing. There will be no access for motor vehicles nor cyclists and both University Street and Torrington Place will be closed with diversions in operation. This will obvously have a major impact on the E-W cycle route on Tavistock Place/Torrington Place. Details of diversion routes are shown in the attached thread.

    Then from December 2nd until Monday 9th the works move south and Gower Street will be closed from north of Chenies Street to mid-way down Bedford Square. The E-W cycle route on Tavistock Place/Torrington Place will re-open. This should have less impact but there will still be local diversions.

    Please sign in to vote.
  • Roadworks: Howland Street

    Created by John Chamberlain // 0 threads

    Howland Street is closed to motor traffic from Thursday 31st for several weeks. Cyclists will still be able to use it except for 2 days, probably 7th and 8th Feb, when it will be completely closed. On these days use the signed diversion via Grafton Way and Whitfield Street or walk through.

    Please sign in to vote.
  • West End Project consultation

    Created by Jean Dollimore // 6 threads

    This scheme proposes to restore two way working in Tottenham Court Road (TCR) and in the Gower Street alignment which includes Bloomsbury Street and Shaftesbury Avenue. All the bus routes will be on TCR.

    The consultation is on Camden's website at:

    http://www.wearecamden.org/westendproject/

    In TCR, Camden proposes a "bus and cycle street" from 8 am to 7pm (Monday to Saturday) with local access for cars, taxis and loading on short sections of Tottenham Court Road via side roads.

    TCR will have a pair of 4.5m wide carriageways to be shared by cycles and buses (90 buses per hour in each direction) and by the additional local traffic.

    In the Gower Street alignment, Camden proposes two-way access for private motor vehicles (no buses) and that these roads will have a pair of 4.5m wide carriageways, each including a lightly segregated 1.5m wide cycle track.

    Other measures proposed:
    - in both TCR and the Gower Street alignment Camden proposes raised sections of road to reduce motor speeds
    - two-way cycling in all the side streets (except for Maple Street, University Street and Howland Street)
    - new public spaces including a new park on Alfred Place and a ladder of calm side streets.

    These changes to roads and to cycle permeability are shown in the diagram at:
    http://www.wearecamden.org/westendproject/assets/images/cycling-plan-resized

    Details of the road layout for TCR are at:
    http://www.wearecamden.org/westendproject/assets/images/tcr-north-resized
    and
    http://www.wearecamden.org/westendproject/assets/images/tcr-south-resized

    Details of the road layout for the Gower Street alignment are at:
    http://www.wearecamden.org/westendproject/assets/images/gower-street-north-resized
    and
    http://www.wearecamden.org/westendproject/assets/images/gower-street-south-resized

    Exhibitions are to be held at the Building Centre, Store Street on 19th June (10 am to 5pm) and 7th July (5pm to 8pm),

    Camden Cyclists are holding a public meeting for cyclists to discuss this project.
    On 30th June 7pm - 9pm
    at the YMCA Indian Student Hostel, 41 Fitzroy Square, London, W1T 6AQ.

    We will finalise our response to the consultation early in July.

    The public consultation will run until Friday 18 July 2014.