Camden Cyclists

Camden Cyclists (aka Camden Cycling Campaign) is the local branch of the London Cycling Campaign. Our website is: http://camdencyclists.org.uk/

All of the Consultations that we respond to are first posted on Cyclescape. We encourage members and others to offer comments and suggestions for inclusion in our response.

After registering on Cyclescape you can post messages on all our public discussions and you can initiate discussions yourself (New Issues or Threads on existing Issues). We strongly deprecate the use of pseudonyms unless they are backed up by a full name shown in your Cyclescape personal profile.

If you are a member of Camden Cyclists or cycle regularly in Camden we encourage you to join the Camden Cyclists Group on Cyclescape. This will give you access to any private threads restricted to group members (we don't currently use private threads).

About Camden Cyclists

We campaign for much better Space for Cycling in London.

Monthly meetings, workshops and training
We meet on the third Monday of each month at 7.30 pm either at Primrose Hill Community Centre (usually) or at Sidings Community Centre , West Hampstead (occasionally). Our AGM is in May and annual party in December.

Interaction with LB Camden, TfL and Royal Parks
We have four meetings a year with a group of Camden Officers to discuss how cycling issues can be incorporated into local area schemes currently being planned and how well they are addressed in built schemes. Paul Braithwaite (Councillor 2006-10 and 10-14, Camden’s Cycling Champion) was a useful participant in these meetings. His role has now been taken up by our new Cycling Champion Councillor Julian Fullbrook. Many ad-hoc meetings are arranged to discuss projects in detail (e.g. West End Project, Royal College Street extensions, St Marks Square). We also have occasional meetings with TfL officers (e.g. on Swiss Cottage gyratory and Camden Road). We participate in the Royal Parks Cycling Development Group.

Bike Week
We hold two regular events in Bike Week, a national event which usually takes place in June. On the Wednesday morning from 8-10 a.m. we provide a Free Cyclists’ Breakfast in Ossulston Street, run jointly with Camden Council (the 2017 event was the 20th in succession). The Ride all Round Camden is enjoyed by people of all cycling abilities. It is led and marshalled by Camden Cyclists and Camden Cycle Trainers and accompanied by police officers. The route starts from the Town Hall, follows the border of the borough clockwise with a picnic in Golders Hill Park.

Social Rides
During the spring and summer we organise a ride at least once each month. These usually include the popular Lee Valley Ride and a train-assisted ride in Herts, Kent or Essex as well as the newer Brent Parks Ride and the Ice Cream Potter. We also lead feeder rides from Swiss Cottage and West Hampstead to the summer Ride London Circuit.

Campaigning Rides
We have led feeder rides to campaigning rides organised by LCC such as the Space for Cycling rides in 2013 and 2014.

  • Roadworks: Guilford Street

    Created by John Chamberlain // 0 threads

    From 18th February to 14th April, Guilford Street will be one-way westbound from Grays Inn Road to Grenville Street for the replacement of a 32" gas main. Eastbound traffic will be diverted via Theobalds Road and Roseberry Avenue but cyclists will be better off using Tavistock Place and Ampton Street (CS6).

    Please sign in to vote.
  • A41-A598 Burgess Hill

    Created by JonC // 1 thread

    Cyclists going straight up the Finchley Road from Swiss Cottage to Golders Green have to cross two lanes of fast A41 traffic, where the Hendon Way turns off to the left.One possible solution would be for cycles to remain on the left and have a facility to use the pedestrian crossing across the top of the Hendon Way. Recommended route via Ardwick Road/Burgess Hill is not efficient and involves crossing 2 lanes when rejoining Finchley Road.

    TfL Enquiry Ref: 13049465 Cycling on Finchley Road CRM001:0373000000770 23/02/2019

    Please sign in to vote.
  • Hatton Garden cycle permeability schemes: St Cross Street and Saffron Street

    Created by Jean Dollimore // 1 thread

    St Cross Street

    St Cross street runs from Farringdon Road, across Saffron Hill to Hatton Garden. It is currently one-way westbound between Saffron Hill to Hatton Garden.

    The consultation proposes two-way cycling all the way through while reducing the short section between Saffron Hill and Farringdon Road to one-way eastbound for motor vehicles (with a cycle contraflow lane).

    Saffron Street

    Saffron Street connects Saffron Hill with Farringdon Road and currently the western end (as far as Onslow Street) is one-way eastbound.

    The consultation proposes two-way cycling all the way through while Saffron St is closed to motor traffic between Saffron Hill and Onslow Street in order to safely facilitate two-way cycling, and to create an improved environment for pedestrians.

    Please sign in to vote.
  • Camden - Tottenham Hale cycle route

    At approximately 12km, this route would connect the town centres of Tottenham Hale, Seven Sisters and the Nag's Head, making it easier for people to make local journeys and use local services. The route would use both main roads and quieter back streets.

    Please sign in to vote.
  • Roadworks: Howland Street

    Created by John Chamberlain // 0 threads

    Howland Street is closed to motor traffic from Thursday 31st for several weeks. Cyclists will still be able to use it except for 2 days, probably 7th and 8th Feb, when it will be completely closed. On these days use the signed diversion via Grafton Way and Whitfield Street or walk through.

    Please sign in to vote.
Spinner Please wait…
Back to top